Mustajärvi Gold Project
The Mustajärvi Gold Project is a new orogenic gold discovery in the Central Lapland Greenstone Belt. Gold-bearing drill intercepts strike over 2.1 kilometres, including multiple holes with +100gram-metre gold intervals, such as 13.05 metres averaging 15.04 g/t gold including 0.8 metre at 100.43 g/t gold. Mineralization is open along strike and at depth, and more than 50% of the project area has seen minimal exploration to date, although it has key identifiers for orogenic gold deposits.
The project covers ~12km2 of flat, glacial till-covered terrain in the Lapland region of northern Finland, 17 km east of the town of Kittilä, with a paved highway and power line crossing the property.
The 2025-26 program of +10,000 metres of drilling is working towards completing the first mineral resource estimate for the project.
